NR 162.19(2) (2)Applicability. The department may only approve a variance from a non-statutory requirement of this chapter.
NR 162.19(3) (3)Request for variance. An applicant shall submit a request for a variance in writing to the department as soon as it is determined a variance is needed. Each request for a variance shall contain all of the following:
NR 162.19(3)(a) (a) The name of the applicant and CWFP project number.
NR 162.19(3)(b) (b) The section of this chapter from which the applicant seeks a variance and a statement explaining why the variance is necessary.
NR 162.19(3)(c) (c) An adequate description of the variance desired, and the facts that the recipient believes warrant the department's approving the variance.
NR 162.19(3)(d) (d) A statement as to whether the recipient has previously requested the same or a similar variance, and if so, the circumstances of the previous request.
NR 162.19 History History: CR 22-045: cr. Register October 2023 No. 814, eff. 11-1-23.
NR 162.20 NR 162.20Administrative fees. An administrative fee, if one is imposed, shall be included in the biennial finance plan established under s. 281.59 (3), Stats., which is approved by the building commission under s. 13.48, Stats.
NR 162.20 History History: CR 22-045: cr. Register October 2023 No. 814, eff. 11-1-23.
subch. III of ch. NR 162 Subchapter III — Storm Water Projects
NR 162.21 NR 162.21Applicability. This subchapter applies to applicants for and recipients of financial assistance for urban nonpoint source water pollution abatement or storm water runoff BMPs. Compliance with the applicable requirements of this subchapter is a prerequisite to receiving a financial assistance agreement under the CWFP for urban runoff and storm water BMP projects. In addition to the sections of this subchapter, all of the following sections in subchs. I, II, and V apply to projects receiving a financial assistance agreement from the CWFP for urban runoff and storm water BMP projects: ss. NR 162.001, 162.003, 162.01, 162.02, 162.055, 162.49 (3), and 162.50 to 162.52.
NR 162.21 History History: CR 22-045: cr. Register October 2023 No. 814, eff. 11-1-23.
NR 162.22 NR 162.22Project eligibility.
NR 162.22(1)(1)A municipality may receive financial assistance under this subchapter for a publicly owned project necessary to control storm water runoff pollution in order to achieve water quality standards, including publicly-owned storm water management projects on public or private land that are required by any of the following:
NR 162.22(1)(a) (a) A WPDES storm water permit issued under subch. I of ch. NR 216.
NR 162.22(1)(b) (b) A performance standard delineated under ch. NR 151.
NR 162.22(1)(c) (c) A storm water management plan or other applicable plan approved by the department for purposes of managing runoff.
NR 162.22(2) (2) A project that is eligible under sub. (1) may consist of individual BMPs on private land that treat runoff and serve one or more private properties if the municipality satisfies all of the following:
NR 162.22(2)(a) (a) Owns each individual BMP.
NR 162.22(2)(b) (b) Is responsible for the proper installation, operation, and maintenance of each individual BMP.
NR 162.22(2)(c) (c) Has unlimited access to each individual BMP at all reasonable times for the purposes of inspection, monitoring, construction, maintenance, operation, rehabilitation, and replacement of the BMP.
NR 162.22(2)(d) (d) Establishes a comprehensive program for the regulation, inspection, operation, and maintenance of individual BMPs and for monitoring the impact of the BMPs on the groundwater where required by the department.
NR 162.22(2)(e) (e) Complies with all other applicable requirements, limitations, and conditions for projects funded under this chapter.
NR 162.22(3) (3) The access required under sub. (2) shall be established through easements, ordinance, or covenants running with the land.
NR 162.22(4) (4) The department may require that the program established under sub. (2) (d) includes periodic testing of water from existing potable water wells and monitoring of aquifers in the area.
NR 162.22 History History: CR 22-045: cr. Register October 2023 No. 814, eff. 11-1-23.
NR 162.23 NR 162.23Cost eligibility.
NR 162.23(1)(1)Eligible costs.
NR 162.23(1)(a)(a) Eligible at a subsidized rate. Allocable project-specific costs that are necessary and reasonable are eligible for financial assistance. Eligible costs include expenses incurred by the municipality for any of the following items and activities when specific to the scope of a scored project, or when approved by the department as necessary or reasonable for the efficient operation or integrity of the storm water treatment works or BMP:
NR 162.23(1)(a)1. 1. `Abandonment.' Abandonment of storm water treatment works or BMPs if approved in the plans and specifications of a scored project or by department staff, including activities such as demolition, re-landscaping, and removal and disposal of municipal waste or other debris.
NR 162.23(1)(a)2. 2. `Access roads.' Construction of roadways necessary to provide appropriate access to urban runoff facilities or BMPs.
NR 162.23(1)(a)3. 3. `Acquisition of facilities.' Costs associated with acquiring facilities of an existing storm water treatment works or BMP if the municipality will own, operate, and maintain the facilities throughout the term of the financial assistance agreement.
NR 162.23(1)(a)4. 4. `Administrative costs of a commission.' Administrative, legal, and other costs incurred by a commission solely for the scored project if identifiable in a contract or agreement between the member municipalities.
NR 162.23(1)(a)5. 5. `Compliance with state and federal requirements.' Costs incurred for activities associated with complying with state and federal requirements related to the scored project.
NR 162.23 Note Note: State and federal requirements may include any of the following: Americans with Disabilities Act design and construction; green project reserve documentation; Davis-Bacon and related acts administration or other activities associated with wage rate requirements; DBE solicitation and documentation; activities associated with the use of American-made products; environmental review of project sites and other activities related to ch. NR 150 compliance, including costs of public notices and hearings; historical, architectural, archaeological, and cultural resources work identified during planning, design, or construction of the project and incurred prior to project closeout; signage requirements, including on a website or at a project site; or audit activities related to the federal single audit act portion of the municipality's annual audit report until the project is complete.
NR 162.23(1)(a)6. 6. `Construction activities.' Activities defined in s. NR 162.003 (16) and included in construction contracts or performed as force account work, including any of the following:
NR 162.23(1)(a)6.a. a. Replacing, repairing, or rehabilitating a storm water treatment works or BMP if identified in the plans and specifications as cost-effective and necessary.
NR 162.23(1)(a)6.b. b. Restoring streets and rights-of-way and repairing damage to items such as pavement, sidewalks, and watermains necessary as a result of construction of the scored project.
NR 162.23(1)(a)6.c. c. Punch list item activities.
NR 162.23(1)(a)6.d. d. Acquiring, consuming, or expending materials.
NR 162.23(1)(a)6.e. e. Obtaining products that comply with federal requirements to use American-made products in CWFP projects.
NR 162.23(1)(a)6.f. f. Other capital costs incurred solely for purposes of the scored project.
NR 162.23(1)(a)7. 7. `Demolition.' Demolishing existing structures if the demolition is part of a scored project and any of the following apply:
NR 162.23(1)(a)7.a. a. The existing structure is part of the storm water treatment works.
NR 162.23(1)(a)7.b. b. The existing structure is part of a BMP project.
NR 162.23(1)(a)7.c. c. The demolition is necessary for site preparation.
NR 162.23(1)(a)7.d. d. The demolition is included in abandonment procedures as approved in the plans and specifications of the scored project or otherwise approved by department staff.
NR 162.23(1)(a)7.e. e. The demolition entails removal of equipment or materials, or both, from inside an existing building or other structure that is part of the treatment works being modified or repurposed as part of the scored project.
NR 162.23(1)(a)8. 8. `Discharge monitoring.' The cost of equipment owned or to be owned by the municipality for illicit discharge monitoring of a storm water treatment works or BMP.
NR 162.23(1)(a)9. 9. `Easements and rights-of-way.' Acquisition of easements and rights–of–way, including purchase cost, and administrative and legal expenses.
NR 162.23(1)(a)10. 10. `Equipment.' Equipment, the costs of which the department may prorate if the municipality intends to use these items for multiple purposes rather than solely for the storm water treatment works or BMP. Eligible equipment includes any of the following:
NR 162.23(1)(a)10.a. a. Mobile equipment, such as portable stand-by generators, portable emergency pumps, and grounds and maintenance equipment for mowing and snow removal, for the storm water treatment works or BMP.
NR 162.23(1)(a)10.b. b. Spare parts, if included in the plans and specifications or otherwise approved by the department.
NR 162.23(1)(a)10.c. c. Machinery for manufacturing or repairing necessary tools or equipment for the storm water treatment works or BMP.
NR 162.23(1)(a)10.d. d. Computers, tablets, and related equipment, including purchasing, installing, programming, or upgrading computers, printers, control systems, and other computer-related equipment necessary for operating and maintaining the storm water treatment works or BMP. Equipment and systems for accounting, billing, public notification, testing, monitoring, reporting, emergency alerts, communications, geographic information, and supervisory control and data acquisition are included under this subd. 10. d.
NR 162.23(1)(a)11. 11. `Fees.' Fees paid by the municipality for any of the following:
NR 162.23(1)(a)11.a. a. Permits obtained for construction, including building, electrical, and plumbing permits, construction site storm water permits, and railroad crossing permits.
NR 162.23(1)(a)11.b. b. Legal fees of an attorney that is not an on-staff municipal attorney, including costs of legal reviews of architectural, engineering, or construction contracts, user charge systems and sewer use ordinances, management plans, intermunicipal agreements, and legal work necessary for securing eligible permits.
NR 162.23(1)(a)11.c. c. Service fees paid to a state or federal agency, except administrative fees paid annually along with principal and interest payments on a CWFP loan.
NR 162.23(1)(a)12. 12. `Groundwater monitoring.' Installing groundwater monitoring equipment or facilities.
NR 162.23(1)(a)13. 13. `Insurance.' Purchasing insurance necessary during construction of the scored project, including property, liability, builder's risk, and construction insurance.
NR 162.23(1)(a)14. 14. `Interim debt.' Costs associated with interim debt for the scored project as delineated in s. NR 162.04 (3).
NR 162.23(1)(a)15. 15. `Land Acquisition.' Acquiring land, including purchase cost and administrative and legal expenses if any of the following applies:
NR 162.23(1)(a)15.a. a. The land is property on which the storm water treatment works or BMP will be located, including urban corridors needed to support integrated systems of a storm water treatment works or BMP for urban runoff.
NR 162.23(1)(a)15.b. b. The land is the property on which individual systems are or will be located if the systems are publicly-owned and maintained.
NR 162.23(1)(a)16. 16. `Management plans.' Developing a detailed management plan for a scored project.
NR 162.23(1)(a)17. 17. `Municipal staff, equipment, and materials.' Municipal expenses incurred solely for the scored project and documented by the municipality as force account work, including any of the following:
NR 162.23(1)(a)17.a. a. Salary and benefits of municipal employees, except elected officials or on-staff attorneys, for time spent working directly on the scored project.
NR 162.23(1)(a)17.b. b. Expendable material costs incurred by the municipality.
NR 162.23(1)(a)17.c. c. Estimated costs incurred using equipment owned by the municipality.
NR 162.23(1)(a)18. 18. `Pretreatment or toxicity reduction.' Developing a municipal pretreatment or toxicity reduction program and constructing facilities to be used by the storm water treatment works or BMP in the program, including monitoring equipment.
NR 162.23(1)(a)19. 19. `Professional services.' Engineering, architectural, legal, and other professional services and fees, including any of the following:
NR 162.23(1)(a)19.a. a. Conducting value engineering studies or analyses during the design phase.
NR 162.23(1)(a)19.b. b. Conducting system evaluations and studies.
NR 162.23(1)(a)19.c. c. Developing facilities plans and engineering reports.
NR 162.23(1)(a)19.d. d. Preparing and submitting plans and specifications.
NR 162.23(1)(a)19.e. e. Preparing, printing, and distributing bidding documents.
NR 162.23(1)(a)19.f. f. Gathering documents and information for, and completing, the CWFP financial assistance application, and other forms required for financial assistance.
NR 162.23(1)(a)19.g. g. Developing or revising an operations and maintenance manual.
NR 162.23(1)(a)19.h. h. Advertising for and conducting bid lettings.
NR 162.23(1)(a)19.i. i. Analyzing bids, preparing award recommendations, and preparing contracts.
NR 162.23(1)(a)19.j. j. Providing construction management, observation, and inspection.
NR 162.23(1)(a)19.k. k. Preparing for and facilitating public education and participation opportunities.
NR 162.23(1)(a)19.L. L. Travel, indirect costs, and labor included in contracts for services related to the scored project.
NR 162.23(1)(a)19.m. m. Preparing a user charge system or an ordinance related to storm water management.
NR 162.23(1)(a)19.n. n. Preparing environmental assessment reports and evaluations.
NR 162.23(1)(a)19.o. o. Conducting archaeological surveys and gathering historical site information.
NR 162.23(1)(a)19.p. p. Providing municipal advisor or bond counsel services related to loan closing or the issuance of bonds.
NR 162.23(1)(a)19.q. q. Producing record drawings.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.